168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Excavation - Site / Utility Permit for RP-2025-009077
Commercial make safe permit - **make safe permit** for removal and replacement of the 1st floor storefront damaged by vehicle impact to comply with violation # cf-2026-021864. not…
Retaining Wall - For New Retaining Walls as per attached standard. Deviations from these standards require submission of construction and site plans.
Temporary tents and canopies - assembly use tent - lawful occupancy shall be as posted - removal date electrical permit required, unless power is provided through existing exterior…
Commercial make safe permit - make safe permit to comply with unsafe violation cf-2025-005711 to include repairs to floor/ roof structure per approved plans/ engineer letter and in…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Sitework with onsite utility services - for sitework and onsite utility for the existing courtyard patio, replacing the storm water drainage pipes below the patio, pitched for prop…
Sign - for the installation of three (3) internally illuminated accessory wall signs. size and location as shown on plans. signs accessory to a sit-down restaurant.
Temporary tents and canopies - assembly use tent - lawful occupancy shall be as posted - removal date electrical permit required, unless power is provided through existing exterior…
Temporary tents and canopies - assembly use tent - lawful occupancy shall be as posted - removal date electrical permit required, unless power is provided through existing exterior…
Retaining wall - for the replacement of existing retaining walls. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any…
Make safe permit for rp - for the replacement of the damaged lintels and brick above the front door and window to resolve cf-2026-022726. all work to be done per approved plans and…
Commercial make safe permit - for the repair and repointing of the damaged exterior walls and lintels to resolve cf-2024-109558. all work to be done per approved plans and engineer…
Sign - for the installation of one (1) flat wall sign with static illumination. all work to be done per approved plans. if field conditions vary contact design engineer prior to th…
Temporary tents and canopies - assembly use tent - lawful occupancy shall be as posted - removal date electrical permit required, unless power is provided through existing exterior…
EZ Interior Non-Load-Bearing Wall Demo. - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references…
Install a new automatic fire alarm system with pull stations in relation to bda-2025-05538. work includes new panels, circuits and devices.
Change of Use - Limited Lodging
Sitework with Onsite Utility Services - FOR SITEWORK AS PER APPROVED PLANS.
EZ Interior Non-Load-Bearing Wall Demo. - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references…
Commercial make safe permit - make safe permit to resolve case violation # cf-2026-002697 to repair damage caused by vehicle impact as per the engineer's report and approved engine…