Search Building Permits
19,784 permits · Plumbing
New Construction or Additions - Plumbing Permit (Exterior Building Drainage) for combo RP-2026-001758
EZ Bathroom & Kitchen Remodel - Replace tub, toilet, lavatory and underfloor piping per EZ standards.
Alterations - Installation of two 3pc bathrooms kitchen sink, and washer box.
Alterations - Replace curb trap and fresh air inlet
Alterations - REPAIR/REPLACE CT & FAI.
Alterations - INSTALL 11 FIXTURES 2 Water Closet/Urinal, 2 Shower/Tub, 1 Laundry Sink, 1 Hot Water Heater, 1 Hose Bibbs, 2 Kitchen Sinks & 2 Lavatories.
Alterations - Curb trap replacement FAI
New Construction or Additions - Plumbing Permit (Interior) for combo RP-2026-001124
Alterations - Replace 5" curb trap with fresh air inlet
Filing herewith modifications to existing building's existing sprinkler system on the 2nd, 3rd, 6th, and 8th floor. Plumbing scope removed. Filing herewith to simply continue this application into per...
Plumbing work filed in conjunction with renovation of 4 story multiple dwelling. no change in usel, occupancy, or egress.
*HUB Consultation Accepted* Herewith Filing Underground Plumbing as part of Site Work in conjunction with New Building Application S00920468.
Existing 3-story multiple use building extension
Scope of work: removal of gas and associated plumbing fixtures -and the installation of new gas and plumbing fixtures as per plans.
Interior renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Interior renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Application filed for plumbing/sprinkler modifications/additions on the 6th floor (altfest) as per plans filed herewith. no change in use, egress, or occupancy.
Interior plumbing work as shown herewith. no changes to egress, occupancy or use.
Herewith filing for the direct replacement of existing plumbing fixtures at cellar level onto existing roughing as per plans.
Remove existing fire water service point of entry piping and provide new secondary backflow prevention and meter assemblies. Modify local branch cold water piping and sanitary drainage. Provide sprink...