168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Cycle 9 swarmp fisp repairs, including brick replacement, masonry repointing, shelf angle cleaning, shelf angle replacement, and concrete spall repair. no change in use, egress or…
Renovation of existing commercial space with a commercial kitchen at the 1st floor including the installation of non-load bearing partitions, countertops, floor & wall finishes as…
Subsequent filing for the installation of 8' height temporary construction fence at open space, as required for storefront replacement. obtain new certificate of occupancy.
Modification of the existing sprinkler system in the GAP Factory Store (Space #0137) as per the filed drawings. No change to use, occupancy or egress.
Interior renovation of the 21st floor office space as per plans filed herewith. no change in use, egress, or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Propose interior renovation of existing commercial space at 011 floor. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed.…
Interior alterations to existing ground floor commercial space to include non-load bearing demo, partition and finishes work. no change to use, occupancy or egress
Modification of existing sprinkler system as per plan in conjunction with the commercial space renovation. No change in use, egress, or occupancy under this application
Hereby filing to relocate and install sprinkler heads with related piping for demised retail space as shown on plans filed herewith. No change to use, occupancy or egress.
NYU Residence Hall, Facade repairs as per the plans filed: Removal/replacement/repairs to cracked/ spalled concrete & masonry units, existing steel lintel and spandrel beams. Scrap…
Interior alterations to existing 25th and 28th commercial office spaces to include non-load bearing demo, partition and finishes work. no change to use, occupancy or egress
Interior renovation of existing business space within the existing 1st floor. no change to use, egress, or occupancy.
Existing 2 family building with interior renovation with partition work at the cellar, basement,1st,2nd floor and open space under this application. no change in use, means of egre…
Proposed horizontal enlargement of existing commercial space.
Filing to replace an existing pool to a study/learning center as part of the college space. Work includes removal and installation of interior non load bearing partitions, doors, f…
Interior partial work for office spaces at 3rd, 5th, 6th and 8th floors.
Alteration on Corner Retail Space and Cellar Storage Space next to Staircase. Work to include: Minor relocation of partitions as indicated on plans,
Propose removal of interior elements and related finishes at existing commercial space at 001 floor all as per plans filed herewith. No change in use, egress or occupancy filed und…
Interior General Construction: install non-load-bearing partitions, doors and frames, and finishes within existing space. No change to use, occupancy, egress, or floor area.
Illuminated non-advertising accessory wall sign - legal use as per i-card 612835 - in property lines - nail lab & spa. no change of use, egress or occupancy.