168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Enlarge an existing rear masonry wall opening at basement level. add new skylight at the roof. no change in use, occupancy or egress.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Structural work as shown on plans for new rooftop atrium.
Material gas hoist during roofing work
Decommission of existing VERIZON site on the roof. Original application filed under Job #321456303. No change in use, egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Legalize the replacement of the roof rafters, shingles and 1/2 wood sheathing for existing garage.
Ps 129x, installation of +/- 324 linear feet of chain link fence, +/- 13 linear feet of sidewalk shed, and 40 square feet of scaffold (on the roof) in conjunction with dob # 201207…
Outriggers system installation for material hoist for roof repairs, no change in use, egress, or occupancy.
Installation of a new non-emergency gas generator, access hatch grab bar, grab bar railings, and high railing enclosure with gate on the roof. No change in use, egress, or occupanc…
Installation of HVAC system in Unit B on the 2nd and 3rd floor, as well as heat pump units on roof. No change to use, egress or occupancy.
Structural scope associated with the Chillers installation on a roof of North Building of DNSY Garage. No change of use, egress or occupancy.
Installation of a temporary roof protection as per plans during general construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building code,…
Existing 45x45 open stairs at 4 floor accesory to part of roof. built 96x71. brick structur bulket
Remove & replace Existing exhaust fans and AC-1 & AC 2 units on the Roof.
Installation of new air handlers in equipment room in cellar with related condenser on the roof. No change in use, egress, or occupancy.
General construction work to include demolition of existing atrium skylight and partial re-building of East and South walls above 5th floor roof and 7th floor parapet. A new Atrium…
Miscellaneous replacement/repair of brick masonry, miscellaneous repair of concrete slab edges with repair mortar, and miscellaneous waterproofing. No change in use, egress, or occ…
PS 306 (Q262): Provide rooftop dunnage to support mechanical HVAC equipment, and provide additional support for existing roof framing. No change to use, egress or occupancy.
Early work removals - Floor 1-5 and roof - Removal of all sprinkler/standpipe components. Cellar level - removal of all sprinkler/standpipe components except EXIST. 6 DCDA AND EXIS…
Application filed herewith for interior renovations with facade, window, and roof replacement to the referenced 2 1/2 story plus basement, two (2) family building at the referenced…