168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Alt-GC application filed for first floor demolition of existing one-story portion of nursing home. New five story horizontal extension to existing five-story portion of nursing hom…
21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of…
Demolition
Structural basement floor and tucked under garage renovation and remodel works of existing single family house per structural engineer's designs. aaj (propject dox plans). tucked u…
demolish of a 2 story retail,no dwellings,no basement.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
documentation to abate nov 201994041 - by legalizing the renoation of rear yard cottage using (e) foundation to add home office as part of front residential unit. (reconstruct unpe…
To construct a two story addition to the rear of existing single family home. will be adding 478 sf of living space on the first floor and 493 sf of living space on the second floo…
to demolish existing structure. RM20 Zoning. not to be burned on lot. MHZC must review application. see attached email from NDOT dated June 13, 2024 indicating that NDOT does not w…
To demolish existing building(s) nothing to remain. Not to be burned on site. Work on this demolition permit must commence within thirty (30) days of issuance and be completed sixt…
Construction of a two-story, 4 bedroom, 4.5 bath single family dwelling with 3888 sqft conditioned space, 457 sqft garage/storage area and 910 sqft of covered porches/decks. minimu…
to construct 2399SF single family residence four bed four bath with 416SF garage and 102SF porches. 5' min. side setback, 20' min. rear setback, front setback is 33.8' measured at…
To get a demo permit. Nothing is to be burned or buried on this parcel.
HISTORIC/CFA Demolition of interior NON-LOADBEARING walls, plumbing fixtures, floor finishes, appliances and cabinets
Demolition of interior finishes and select partitions, doors, millwork, ceilings and lighting of an existing ground floor restaurant.
Removing interior walls, built-ins, floors, kitchen cabinets, bathroom fixtures.
CHINATOWN / HISTORIC Demolition of 4 levels. The work consists of, but is not limited to, retrofitting existing lecture classrooms into mock pharmaceutical labs and basic science l…
Eplan: Demolition 1-story SFD and detached Garage"COMPLY WITH DEPARTMENT ORDER effective date 06/08/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"
Interior Non-Structural Demolition
Sfr demo (res)
510 NOLAN ST - Emergency Demo