168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Tenant build out for a new fine/fast-casual restaurant with dine-in and take-away services including demolition and general construction work of interior walls and finishes. no cha…
Full demolition of the existing building.
Partial demolition to existing 1 story & cellar building; proposed vertical and horizontal enlargement; alteration to meet new building requirements with existing elements to remai…
Partial demolition of the illegal 7th floor of the new 6th story building to address violations 39173838M and 39173839Y.
Full demolition of the existing building.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Full demolition to a three story building
Full demolition one (1) story building of #66 gar bay 22nd street, brooklyn, ny 11214; block: 6372; lot: 78; height: 12'-0
Construct One Single Detached Two Story Two Family New Residence with Cellar Where Existing Single Detached One Family Residence Was Demolished Under DOB Signed Off Application #52…
Combination and Renovation of an existing apartments 16G and 17G on the 16th and 17th floors. work includes non-structural demolition and general construction as per plans filed he…
One story vertical extension on top of the existing 5-story mixed-use building, including facade repair, rehabilitation, and partial demolition on all floors, to convert to a resid…
installation of construction fence to protect site during full demolition.
Full demolition to a three story house
installation of construction fence to protect site, during full demolition
Demo of three story structure
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 18th and 21st floor as per plans. No change to use, egress or occupancy.
Full demolition of 1 story detached rear structure to comply with nyc hpd accelerated declaration, dec# 19329
Full demolition of 1 story garage to comply with nyc hpd accelerated emergency, dec# 19328.
Inteior demolition of non load bearing partitions on the 31st floor (north/northeast corner) as indicated on drawings.
Full demo of 1 story building in rear of property.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes in the basement & Storefront (Tenant Work- Le Cafe) as per plans. No change to use, egr…