168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Meter and panel change out grounding gas meter Installing 2 ground rods and grounding the panel
New 2-story 3 bedroom 2.5 bathroom dwelling unit with attached carport covered front porch and rear covered patio.
New 2-story 3 bedroom 2.5 bathroom dwelling unit with covered porches.
Existing utility meter is set too low. Need to raise the meter.
Install a T-pole for home repairs Ref: 2026- 060030 BP
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
BLDG 2: New 2 story SFR with attached garage and covered front porch and covered rear patio. 3 bedroom 2.5 bathroom.
Residential new construction rough-in trim-out and service Ref: 2016-135441-BP
Reconnect after a temporary disconnect in order to repair a broken electric cable underground.
Electrical maintenance permit. occupancy: business. start date: 5/30/2026. end date: 6/29/2026. all work under this permit must be performed by employees of the listed electrical c…
Line voltage electrical work. new permanent 200 amp service disconnecting means with 1 circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: interior/exterior.
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: basement to garage.
Electrical - commercial miscellaneous - building
remodel bathroom like for like to replace tub, double sink vanity, replace toilet, install new tiles, rewire electrical and new gfci outlets.
new bath remodel, new laundry closet, kitchen remodel, new dining room (change of location only) existing bearing wall shortening with new structural beam to resupport joists. plum…
kitchen & bath remodel 2nd & 3rd floors: unit#353,#352,#356,#450,#454,#455,#456. all work in this permit is for "replace-in-kind", electrical & plumbing to be done under separate p…
tub to shower conversion, bath remodel remove existing bath tub and install new shower pan. no structural changes, no added floor area. separate electrical, plumbing, mech.
unit 201: interior renovation. convert (e) powder room to new full bathroom. install new washer/dryer. extend kitchen cabinets, new kitchen appliances. relocate electrical sub-pane…
unit 1013: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 2 baths remo…
unit 1014: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 1 bath remod…
unit 4: kitchen and bathroom remodel, new finishes, upgrade electrical and plumbing. no change in plumbing fixture count, no wall demolition or construction.