Search Building Permits
8,887 permits · HVAC
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Hvac as per plan
Remove and replace ceiling on cafeteria alongside first, second, and third floor corridors. Remove portions of exterior wall for HVAC access. Install new partitions in cellar to make new rooms. Replac...
Replacing the HVAC Units.
Replacing the HVAC Units.
CAP & remove gas piping from rear cottage and replace gas stove with electric stove. Cap & Remove Residential gas stove & kitchen sink in basement kitchen, remove existing gas boiler & hwh, filing to...
Modifications to the existing HVAC system on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Installation of one (1) new gas boiler in cellar
File to remove and cap existing boiler and install 2 new tankless water heaters with existing gas valve with neutraliziing kit, drain and trap. no change in use, egress, or occupancy.
Replace oil burner on exisitng boiler.
Install new boiler exhaust vent per plans.
Application filed for mechanical modification, exhaust fan, Split system air conditioning unit
Install (5) ductless hvac split systems and (1) ducted heat pump split systems
SB 4th Fl:: Modifications of HVAC equipment and ductwork to accommodate alterations within the existing building as per plans filed herewith only.
To install new ductworks and air devices throughout the space and connect to existing HVAC units and Mechanical work for the exhaust hood in the commercial kitchen of an eating and drinking establishm...
Replace one gas boiler with three gas boilers, three gas hot water heaters and three gas meters. install one toilet and sink and gas re-pipe of entire building.
Proposed installation of air conditioner system as per plan. no change in use, egress or occupancyunder this application.