168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
SUPPLEMENTAL TOComplete work done under previously expired permit #_____15016-30000-25052_____. Work is ___90___% complete(Minimum 75% percent completed as determined by inspection…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and aseparate express electrical permit for new pool luminaire is required, when applicab…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Add sill plate anchor bolts, add plywood to cripple walls (if existing) and replace foundation per L.A. CityStandard Plan #1 (Earthquake hazard reduction per Chapter 92 of the Los…
1 Kitchen 1 bathroom remodel for residential buildings (no structural changes). 1 Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certifie…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
installation of (n) facu in mgrs office,cell communicator next to panel with pull station and f/a remove annunciator at entrance.relays and modules for (e) passenger elvator functi…
installation of (n) facu in mgrs office,cell communicator next to panel with pull station and f/a remove annunciator at entrance.relays and modules for (e) passenger elvator functi…
remove (e) 1872 sqft 2 column fueling canopy, columns, & footings, replace w/ (n) 2 column 1872 sqft fueling canopy. install (2) 23k gal double wall, split compartment underground…
remove one structural wall, demolish and renovate kitchen. install new hvac on floors 1 & 2. install new beam per engineers specs. replace two existing patio doors in kind.
adu at 1/f, replace (e) garage with (n) living area, install (n) kitchen and (n) half-bathroom and mech equipment for adu, replace (e) furnaces for house, replace (e) water heater,…
non bearing int partitions, doors, hard ceilings, suspended ceilings, elec sub panels, receptacles, switches, light fixtures, mech ducting from e units, restrooms, mop sink, breakr…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Change of use of an existing type i (lacbc 1972), 8-story (with basement) high-rise office building into type i-a 170 affordable housing units and two manager's units under the hom…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
*eplan* Supplemental to 20014-10000-05704 - Noise, Vibration, and Seismic Controls for HVAC Equipment Shop Drawings.
revision to pa# 202605191576: no longer doing a bathroom remodel, instead doing a kitchen remodel. insulation and drywall installation in main level ceiling. replace old duct syste…