Search Building Permits
2,850 permits · HVAC · NY
Install one (1) new gas-fired high pressure boiler as per plans. no change in use, egress or occupancy.
Install new gas piping and new meter for two gas-fired boilers ,and install hot water storage tank in cellar.
Filed herewith for mechanical work, including modifications to existing hvac ductwork, new walk-in box condenser and evaporator units, and new kitchen hood with associated ductwork. no change to use,...
New HVAC system on a portion of the 13 floor (marketed as 14) in conjunction with Alt #M01367407 as per plans filed
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Interior renovation of cellar,basement,1st,2nd and 3rd floor of exist. 3 story building.Demolition work and construction work as per plan.Install new HVAC,exhaust fan,partition,flooring,ceiling and pa...
Install 2 temporary boilers in conjunction with previously approved subsequent filing -s4
Fit goodman ac: modification of hvac equipment and ductwork to accommodate alterations within the existing building as per plans. no change to use, egress or occupancy.
Nycha boiler - removal and replacement of plumbing fixtures and associated piping for interior renovation of mechanical equipment room.
NYCHA BOILERS_BLDG#5_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters and storage tanks, and new gas meter assembly and gas piping to gas water heaters.
Install new boilers in cellar as per plans
Modifications to the existing HVAC system on the 6 & 7 Floors as per plans. No change to use, egress or occupancy.
NYCHA BOILER_BLDG#4_Remove exist steam-fired DHWH exchanger. Remove and replace sump pump. Install new gas water heaters and storage tank, sump pumps, floor drains, and gas piping. Provide new water c...
Ahb egen: modification of hvac equipment to accommodate the installation of new emergency generators as per plans.
Proposed to install two gas fired boilers for moderate renovation of existing 4-story + cellar new tenement building in conjunction with gc application # b00622757-i1.
B Bldg. Econ: Modification of HVAC equipment and ductwork to accommodate alterations for the new economizer as indicated on plans filed herewith. No change to use, egress or occupancy.
Feldman Econ: Modification of HVAC Equipment and Ductworks to accommodate installation of a new waterside economizer as indicated on plans filed herewith. No change to use, egress or occupancy.
Modification of existing HVAC system on the 33rd Floor (Moroccanoil Office), including the installation of new units, and associated ducts and piping, as per plans. No change to use, egress, or occupa...
Interior renovation of two-family house with plumbing work: install new kitchenette and bathroom fixtures; new boilers and hot water heaters on cellar as per plan. no change in use, egress or occupanc...
Proposed replacement of existing Computer Room Air Conditionings (CRAC) units serving Academic Building 1, of the following CRAC Units:CRAC-6, CRAC-7,CRAC-8,ACC-3.. All as per Plans filed herewith. No...