168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
This plumbing work is filed as a subsequent application related to job #q01389956. no change in use, egress, or occupancy is proposed under this application.
Herewith filing for plumbing modifications as per plans. no change of use, egress or occupancy this application.
Proposed,relocate, remove plumbing fixtures and roughing system in basement and second floor. proposed (2) floor drains, relocate 3 pc bathroom and relocate kitchen in basement. pr…
General renovation of 2-family house with replace/relocated/new plumbing fixtures and boiler and h.w.h as per plan. no change in use, egress or occupancy.
Install plumbing fixtures @ partial 1st floor of store area. no change in use of egress & occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
File plumbing work of 1-family building to install new/relocate plumbing fixtures and gas appliances as per plan. no change in use, egress or occupancy.
Application file plumbing fixtures and piping work at cellar level. No change of use or occupancy.
Replace 3 toilets, 3 lavatories, 1 kitchen sink, 1 dishwasher, with new on existing roughing. Remove 2 bathtubs. Install 2 new showers on existing roughing. Relocate and Install a…
Plumbing work in conjunction with New Building application
PLumbing work as per plans
Remove illegal full height partition walls, 3-piece bathroom, and relocate & legalize 2-piece powder room & slop sink in cellar. Restore cellar to prior legal use. Cap & remove ill…
Replace: 7lavs,7wc&2urinals on existing roughing on floors 7,10,11&12. new: install 1 wc, 1 lav , 1 hwh non gas, 1 water piping & 1 sanitary piping on floors 7,10,11&12.
Minor removal and installation of plumbing fixtures as per plans.no change to egress, use nor occupancy.
Plumbing modifications taking place in the cellar and 1st floor as per drawings filed herewith. No change in use, egress or occupancy.
Replacement of 2 Existing Bottle Fillers with 2 New Drinking Fountain with Bottle Filling Station on the North and South side of the Gymnasium. Extend Existing Rough-in to serve fi…
Installation of new plumbing fixtures, equipment, and associated piping
Plumbing work type hereby filed subsequent to the Alt. CO application: B00924812-I1
Filed plumbing work for a deli renovation. no change to exist. use, egress or occupancy
Plumbing work in conjunction with construction of New Building.
Reconnect replacement boiler to exg. gas line. replacement boiler filed under separate be application. no change in use, egress or occupancy.