168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Additional concrete slab and foundation walls in Boiler Room in cellar. with concrete ribs at Boiler Room pit. Concrete and metal deck infill at existing openings on Roofs. Enlarge…
PS 306 (Q262) - Replace roofing, replace ACT on Third Floor, add door in Cellar, replace cooking appliances, add stair and railing at rooftop dunnage, in conjunction w mechanical e…
Proposed renovation of an existing BBQ amenity located on the roof area accessory to the penthouse residential unit that includes cosmetic improvements and minor structural work. N…
Replacement of 6 ton rooftop unit. no change to egress, use, or occupancy.
Carrier: T-Mobile.Modification to existing antenna site. Replace (3) existing antennas on an existing mount on the roof. Relocate (1) existing antennas sectors. Install (3) additio…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, elec…
Modification to T-Mobile site. Installing 3 antennas and 9 RRU's on the roof. Replace 9 antennas on the roof. Remove 1 cabinet and install 2 cabinets on existing steel platform on…
Filing application for installation of new roof insulation, green roof system, glass railings and pavers. No change to use, egress or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Renovation of the 2nd-floor mechanical room, as well as the roof portion where the mechanical equipment is located, is associated with the General Construction scope. No change is…
Interior renovation of an existing apartment within a 2-family residence addition of a rooftop bulkhead & selective demolition of non-load bearing/firerated interior partitions, co…
Install safety railings on roof side of the parapet at the roof level to meet FISP requirements.
Filing for the application of four main project scopes: roof, parapet, masonry and flood elimination as per plans submitted herewith. no change in egress, occupancy or use.
Proposed Structural Work for the renovation and installation of roof dunnage in conjunction with Alt-CO # M00995632-I1.
Structural framing for the 2nd & 3rd floors extension and the building roof system.
Install railings on parapet at the roof level to meet FISP requirements.
Install railings on parapet at the roof level to meet FISP requirements.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Temporary shoring of 6th-floor ceiling to support the roof joist.
Replacement of existing hvac roof top units as per plans. no change in building use occupancy and/or egress.