5,069 permits · Pool & Spa
finish and unfinished space
Bldg. 1.3- Lvl 0 Units (AP) - This permit is for Building 1.3 Level 0 Units. The 14 units are: B112, B114,B116, B118, B120, B122, B167, B169, B171, B173, B175, B177, B179, andB181. B173 and B118 are l...
Convert existing unfinished attic space into a conditioned, habitable bedroom with a full bathroom.
convert (e) storage space on g/f into dwelling unit.
add interior stairs from unit# 1 to basement and convert the storage rooms in the basement into habitable space. add 2 bedrooms and 2 bathrooms. add rear landing, rear firewall, and rear access door f...
merge 2 vacant commercial spacwe ( 2573 & 2575 mission ) to one commercial space (2575 mission st). proposed ti at first fl & reviving the mezzanine to accomodate new restroom/bar, new kitchen, new re...
turning 1st level garage to conditioned space w/ kitchen, half bath and living room. 2nd level is reorganized into 4 bedrooms, 3 full bath, laundry and family room. exterior new deck at 1st lvl from l...
New swimming pool
NEW POOL
Proposed medical office on existing first floor commercial space; installation of new partitions, floor finish, drop ceiling and new restroom.
POOL/SPA
General construction for renovation to office space for Lieff Cabraser on 8th floor.
Interior alterations to the 4th floor office space to include general construction work as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress
POOL
Back fill the (e) pool - shell to be removed
Interior Demo to existing 2nd floor office space as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress
Grading excavation for the new pool
ePLANInterior alteration to create a NEW SECURE SPACE WITHIN EXISTING WAREHOSUE AREA.Fire sprinkler NFPA-13 - throughout.
Swimming pool-spa
Above ground pool
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com