Search Building Permits
2,063 permits · Demolition · NY
Minor interior renovation in apartment 11F on the 11th Floor. Work includes non-structural demolition, general construction and new exhaust as per plans file herewith. No change to use, egress or occu...
Minor interior renovation in apartment 11F on the 11th Floor. Work includes non-structural demolition, general construction and new exhaust as per plans file herewith. No change to use, egress or occu...
Partially demolish existing mechanical systems, ductwork, piping, equipment, etc. furnish and install new mechanical piping and valves, accessories, etc. provide all mechanical services, materials, et...
Interior demolition and renovation of firstlevel. only as indicated on the drawings and replace existing rear deck
Fully demolition of existing one story house
Full demolition one (1) story garage.
This job is filed for construction fence for full demoltion work at 748 41Street, Brooklyn, NY 11232
Debris chute will be installed/built to lower debris from floor to floor. Mechanical means will assist with demolition from exterior and placed on grade.
Full mechanical demolition of existing 1 story residential house
installation of construction fence to protect site, during full demolition
Exterior: new storefront windows in existing openings. removal of existing canopy and addition of exterior signage.interior: tenant build out for a new fine/fast-casual restaurant with dine-in and tak...
Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
Proposed temporary construction fence for the demolition of the existing building and the construction of the new detached one family residence.
Limited demolition of the 663 space for future Ferragamo Flagship, including Floors 1-3, Structural filing for slab infills, & new non-load bearing party wall separating building no. 663 from 655 5th...
Mechanical means submitted for use of mechanical equipment and use of chute at the time of demolition in conjunction with the demo application
Full demolition on existing 1-story detached garage in rear yard.
Minor interior renovation in apartment 11F on the 11th Floor. Work includes non-structural demolition, general construction and new exhaust as per plans file herewith. No change to use, egress or occu...
Phase 2 demolition of interior finishes/partitions within an unoccupied college dormitory. Related work filed under ST# M01310628 and ALT CO #M01264739 as part of NYC DOB MPP Program. No change in use...
Full demolition to an eight story building
Partially demolish existing mechanical systems, ductwork, piping, equipment, etc. furnish and install new mechanical piping and valves, accessories, etc. provide all mechanical services, materials, et...