168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Self-cert 2019 cbrc: replacement of hvac system and steam boilers, patching of walls, floors, ceiling affected by mep work
Self-certification 2019 cbrc: interior alteration of existing office space in an existing high rise office building. the scope of work includes minor demolition of non load bearing…
Convert existing commercial building into a mixed-use building adding 9 dwelling units on the second level to the existing 2 story with basement building,work includes architecture…
New heat pump or refrigeration equip., electrical work under this permit = yes . locations: 0 residential unit(s), 1 non-residential unit(s), exterior work, replace elevator split…
Spr 2019 cbrc: interior rehabilitation of existing 3 story with basement 4 dweling units building as per plan. no hvac work - existing hvac to remain. r-2 occ.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Self-cert 2019 cbrc: revision to permit 101072931. revision includes rerouting ductwork, relocating mau and exhaust fan and structural reinforcement for hvac equipment. (existing a…
Self-cert 2019 cbc; furnace replacement only at existing 4th floor apartment unit per plans (only work at 4th floor). existing 4 story mixed use masonry building with (3) existing…
Spr 2019 cbc. fire damage restoration of existing two story mixed-use masonry building with ground floor restaurant and second-floor residential apartment. (occupancy a-2 for resta…
Spr 2019 cbrc: interior alteration to existing basement for new interior slab, wall finishes, upgrades to hvac and lighting and associated plumbing for new restroom. (b-business. t…
Repair/replacement affecting 2 systems : 1 duct furnace(ameristar 40,000btu) 1 split system(ameristar 2ton) . electrical work under this permit = no . locations: 1 residential unit…
Self cert 2019 cbc; furnace replacement only at existing 3rd floor apartment unit per plans (only work at 3rd floor). existing 4 story mixed use masonry building with (3) existing…
Scope: nonstructural interior alteration to electrical and hvac atexisting office for new concference room and offices (affected area 1030 sq ft), replacement of plumbing fixtures…
Scope: nonstructural interior remodel including electrical and plumbing, replacement of furnace and water heater in the same location .locations: 1 residential unit(s), 0 non-resid…
Self-cert 2019 cbc; furnace replacement only at existing 2nd floor apartment unit per plans (only work at 2nd floor). existing 4 story mixed use masonry building with (3) existing…
Gas piping extension/reconfiguration, electrical work under this permit = no . locations: 0 residential unit(s), 1 non-residential unit(s), 1 interior common areas, basement mechan…
Self-cert 2019 crbc. existing cps florence nightingale elementary school. no change in use. site improvements for new artificial turf athletic field and new playground. demolition…
Self cert 2019-cbrc: convert existing 2 apartments to 3 apartaments building group r-5 work to include: interior remodeling new hvac system, plumbing and electric work also repair…
Repair/replacement affecting 1 systems : 1 central furnace(american standard, 100,000 btu 13 seer, and ac unit, ground floor) . electrical work under this permit = no . locations:…
Self-cert 2019 cbc: interior alteration to lower level in a 2-story health center building. updates include architectural, plumbing, hvac and electrical work. building occupancy ty…
Repair/replacement affecting 1 systems : 1 central furnace(comfort maker; n966msn080176a; in unit 2704-2f) . electrical work under this permit = no . locations: 1 residential unit(…