Search Building Permits
2,766 permits · New Construction · NY
Facade repair which includes brick repointing,lintel replacement, brick replacement andsill replacement as per plans. no change inbuilding use, occupancy or egress.
Filed herewith plans and application for a new temporary plywood construction fence filed in conjunction with nb#q01374766-i1
Construction fence in conjunction with New Building #B00775071-I1.
Soe specifications filed in conjunction with nb application #x01218505-i1.
Subsequent filing for building fire sprinkler system scope of work only associated with the new building.
Filing temporary fire alarm/ standpipe in conjunction with nb app q01049852
Subsequent filing for structural & foundation scope of work associated with the new building.
Use of Telehandler for SOE and foundation construction. This application is filed in conjunction with NBQ01118133-I1
Installation of pipe scaffolding during new building construction as per plan and in accordance with Chapter 33 of NYC Building Code.
Install temp. construction fence in conjunction with nb job #421960471.
Support of excavation being filed for new building.
North hoists-cars 1&2: equipment use: dual 7400# capacity personnel/material hoists during nb filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this...
Hereby filing for a new sprinkler & standpipe system in conjunction with nb#q00487705.
Hereby filing for a new sprinkler & standpipe system in conjunction with nb#q00487705.
Sprinkler / Standpipe application filed subsequent to Alt-CO NB; job number: Q01078424-I1.
Sprinkler / Standpipe application filed subsequent to Alt-CO NB; job number: Q01078424-I1.
Construction of 1 story new building for new pneumatic waste collection system for the polo grounds nycha campus in harlem. related applications to be filed as subsequent applications.
Filing herewith for sprinkler/ standpipe as per plans. Filed in conjunction with NB.
Filing herewith no work application to update metes and bounds for zoning lot to include newly created tax lot 64. the zoning lot boundry hasn't changed. subdivision application 220212892 and nb appli...
New Building - Residenatial 5 Story with Cellar 10 Dwelling Units