168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
2025 wildfire project, grading for new sfd with basement, new retaining walls, shoring, and pool / spa excavation. eo8 eligible.
Proposed cabana/storage and pool deck
Eplan. supplemental to 26047-10000-00454 to revise site planto revise the dimension measured from pool to garage overhangno change to pool dimension, no other changes
Grading for new 2-story sfd with att. adu and basement, site grading , pool
2025 wildfire, new 41'8'' x 14' swimming pool with spa.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
2025 wildfire project, new swimming pool and spa per la city standard plan #268 and engineer details. eo8 eligible.
Supplemental to permit #25047-10000-00780 to change depth from 6' to 5' . No change in plot plan .
Addition of a storage area in crawl space per engineer design *1 of 2*"COMPLY WITH DEPARTMENT ORDER effective date 10/17/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". CEIS…
(eplan) Structural alteration and tenant improvement to existing retail space. Work includes removal of walls in sales area, painting, finish upgrades, installation of new fixtures…
Grading for an addition off a storage area in crawl space per engineer design *2 of 2*"COMPLY WITH DEPARTMENT ORDER effective date 10/17/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUA…
eplan Change of use and T.I to (E) office/print shop to a new retail space. New fixtures, shelves, finishes, bathroom alterations, and accessible ramp.
Fence wall for the pool enclosure
Grading for new pool
New private swimming pool
change of use at family room lower floor to adu. install kitchen into family room & add 463 sq ft w/ new bathroom & entertaining room at lower floor. garage convert into conditione…
1)provide plan for verifying host, compliance for the house's str certificate ,# str-0006557 & for continuing the short term rental business. 2)build non-structural & 1 hour fire r…
exploratory work- 3 24x 24 openings in sheetrock to determine direction of framing, for future tenant improvement. for spa.
to comply with nov#'s 202658563 for decorative panels as security panels w/ 50% transparency at storefront 5-6" ht w/ sliding entry gates to remain opened during business hours(fre…
1/fl-all work is interior. no exterior or change in occupancy or use. remove (e) non accessible restrooms in tenant space 317. (n) fully complant accessible unisex restroom. volunt…
ePlan**2025 Wildfire Ineligible Project**New Pool and Spa. All work per Std details of 268 and additional engineer details.