168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior renovation of 4th floor exam room as per plans. no change to use, egress oroccupancy.
Combination of apt's 801 and 802 as per TPPN 3/1997. Remove and install interior partitions, doors and finishes. Remove one kitchen under separate LAA filing. No change to use, egr…
Renovation of unit #GRF on basement floor, unit 1A on first floor and unit 2A due to fire. Replace partitions, ceiling and flooring. No change in use, egress or occupancy
Herewith filing for a rear yard extension at cellar and first floor filing to patch and repair surfaces and finishes as required no change in use or occupancy.
Interior alteration of existing retail on 1st floor. minor interior finish renovaiton. no change of bulk, use, or occupancy under this application.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Facade repairs as indicated on plans submitted herewith. there is no change in use, egress or occupancy.
Filing for interior renovation of apt 10/11c as per plans submitted herewith.
1. remove non load bearing partition in the cellar as per plan.2. create 2 pcs bathroom enclosure in the cellar.3. create storage room in the cellar.
Existing two-family house renovation with partition work at basement, 1 st & 2nd floor under this application.2. no change in use, means of egress or occupancy
Interior non-structural alteration of unit 1b. replacement of fixtures, finishes, and lighting. no change in use, occupancy or egress.
Elevator and toilet room tower installation, interior partition installations, door replacements, signage installations, vertical platform lift installation, interior repairs and p…
Proposed interior renovation of cellar, 1st, 2nd fl. & attic of exist. 2 story building. replace existing driveway, install metal fence and gate at osp, partition work as per plan,…
Add new Two Story Rear addition with new attached open wood deck. Remodel portion of existing Cellar and add Cellar enlargement . Remodel portion of existing First Floor interiors.
Parking garage repairs & rehabilitation no change in use egress or occupancy
Exterior wall repairs at this existing building. No change of Use, Egress, or Occupancy.
Exterior facade repairs including select masonry repairs as shown on drawings and as specified. No change in use, occupancy, or egress.
Restoration of 4th fl. fire damaged units. replace fire damaged 4th fl. ceiling joists. replace cockloft framing with decking. replace defective parapet walls with chain linked fen…
Suspended scaffold outrigger system installation for facade repairs and inspections.
Exterior facade repair as per plans. no change in use, occupancy, or egress.
Repair of existing exterior facade elements, such as mortar joint repointing, outer wythe brick replacement, patching & crack repair of stone & terracotta ornamentation, stucco rep…