168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Non-illuminated non-advertising accessory wall sign - in property lines - shocks & struts. no change of use, egress or occupancy.
Installation of (2) Mobil canopy logo signs. No change in use, egress or occupancy.
Non-illuminated non-advertising accessory wall sign - in property lines - brakes. no change of use, egress or occupancy.
Application herewith filed to propose new stationary non-illuminated and illuminated indirect sign to be in compliance. no change in use, egress , and occupancy.
Erect illuminate non advertising sign on wall. DUNKIN'-No change of use, egress or occupancy
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Erect illuminate non advertising sign on wall. DUNKIN'-No change of use, egress or occupancy
Erect an non-illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. no change in use, egress or occupancy.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Erect steel pole on existing concrete footing for ground sign
Erect exterior aluminum backer panel cabinets above commercial storefront
Installation of sign pole/ foundation.
Foundation design
Construction of New Commercial High Rise Building. NYC Development HUB Consultation on 8.11.2021. ENERGY MODELING SUBMITTED UNDER MECHANICAL SUBSEQUENT FILING M00615380-S5.
Please assign to hub cdu per consultation on 2/18/26. structural work for installation of temporary av screen and platforms for temporary performance venue.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Erect exterior aluminum backer panel cabinets above commercial storefront
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Erect steel pole on existing concrete footing for ground sign
Please assign to hub cdu per consultation on 2/18/26. structural work for installation of temporary av screen and platforms for temporary performance venue.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola