Search Building Permits
3,477 permits · Demolition
building b-4: demolish of a type-v, 2-story, 6 unit residential r-2 .
building a-2: demolish of a type-v, 2-story, 1 unit mix use residential r-2/b .
building a-1: demolish of a type-v, 2-story, 6 unit residential r-2 .
5th floor: interior tenant improvement work including selective non-strucutral demolition and new interior construction. scope includes new partitions, ceilings, lighting, power/data layout, and finis...
Full demolition of 2 story rear building at subject premises
Interior Demolition interior partitions, doors, ceilings and flooring.
demolition of one-story building. On-site and off-sit fill not to exceed 300 cubic yards.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 8th floor (HITT-Office Buildout) as per plans. No change to use, egress or occupancy.
Interior non-structural demolition and general construction as shown on plans filed herewith at unit 6a. scope of work includes interior partition, millwork installation, lighting replacement, and ref...
Full demolition of 2 story rear building at subject premises
Establish use as vacant land per land use code. Demolish one-family dwelling and associated detached accessory structures subject to field inspection [STFI].
demolition of one-story building. On-site and off-sit fill not to exceed 300 cubic yards.
Total demo of sfr 762 sqft circa 1948
EPLAN. demolish 1 SFR to handwrecking method. sewer cap and pedestriane fence is required.
Interior Non-Structural Demolition
Demolish two-family dwelling and detached accessory garage per plan. [Work on adjacent property under associated demo permit #7079243-DM.]
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 8th floor (HITT-Office Buildout) as per plans. No change to use, egress or occupancy.
ePlan: Demolish existing detached garage.***SEE COMMENTS***
Total demo of pool and spa and stone deck 450 sqft
Demolish (e) 2-car detached garage.