168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
unit 7: residential remodel, all new fixtures, toilet, tub, sink, lights, new flooring, new appliances, new whirlpool tub, flooring contains electric heating under flooring. all wo…
deferred elec and mech. 202505216975 and 202604230002 mech 3 new exhaust fans replacement,3 new fire smoke dampers. new ductwork as needed.reconfig ductwork,air dist ddc controls a…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
EPLAN Proposed parking reduction per AB2097.
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applica…
****2025 la wildfire eo-1 eligible rebuild****new 2-story sfd with mechanical basement , nfpa-13d fire sprinklers required throughout , all work per engineering
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and aseparate express electrical permit for new pool luminaire is required, when applicab…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Replace existing pre-fabricated fireplace with the same size and in the same location. Installation shall be as per manufacturers recommendations. A HVAC permit is required.
installation of new supply + return ductwork for heat pump system, including duct runs, boot sealing, insulation and connections to air handler. work to comply to title 24 requirem…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applica…
ePlan: Remodel of an existing retail space. Demolition of ceiling, lighting, power/data, restrooms. Demo HVAC duct system and soffit. Demolition of double door entry and 2 glass pa…
unit #261a: replace countertop in kitchen and refurbish cabinets; bath: replace tub; no other work; no change in layout; rewire electrical. replace hvac - replace furnace in same l…
replace accessible ductwork
1) remove an exterior window and replace a new door. 2)convert storage space to new media/bedroom. 3)infill (e)door in garage. 4)remove (e) garage window, replace w/ door. 5)/reloc…
23rd fl - demo on per ab-017. demo existing partitions, doors, ceilings, electrical, plumbing, millwork, finishes and hvac throughout
interior remodel: installation of ducted range hood vent in kitchen; renovation of e bathroom; removal of e raised floor inoffice to level floor; installation of stacked washer and…
mechanical revision to pa# 202405172411: remove 10' (e) dryer exhaust duct. install (n) dryer booster fan, duct, control, mounting, connect to existing electrical. replace (e) tran…