Search Building Permits
5,430 permits · Roofing · NY
Roof framing support modification for new rooftop mechanical equipment. no change to use, egress, or occupancy.
Alt CO filed to combine 2nd floor dwelling units, remove and replace stair bulkhead at roof as per plans.
Installation of new sidewalk shed for reso a rooftop playground - ps 290m at 311 east 82 street, manhattan as indicated on plans. there will be no change in the use, egress, or occupancy under this ap...
Installation of a temporarily supported scaffold, overhead and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Obtain cert. of compliance for existing rooftop hvac unit(s) for apt 5ab, as per plans and specs filed herewith, in accordance with approved -lpc permit cne lpc-26-07406 dated 03-05-2026. see comments...
Installation of temporary roof protection as per plan. no change in use, egress or occupancy.
Filing for a temporary mock up at the roof. No change to use, egress. or occupancy.
Installing 4 new roof drains and re-flashing of existing vent stack extensions.
Remove existing Roof drains/piping, replace with new drain, piping and flashing. Re-flash, wire brush, repaint existing vent stack. Replace Fire pump including piping, fittings, valves and controller....
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of PV solar on existing roof no change to egress or use of occupancy
Installation of new packaged rooftop emergency generator w/ integral fuel storage tank in this pre-1968 existing building. no change in use or egress.