13,648 permits · HVAC
Install hvac system for 2nd-4th floor for the building in subsequent with job#b01146694, in order to remove ecb violation#39129793j. no change in use, egress and occupancy.
1- Kitchen 2-bathroom remodel for residential buildings (no structural changes)Include HVAC, Electrical, Plumbing15- Window change-out (same size & type) for residential buildings. Dual glazing, label...
Complete work done under previously expired permit #20010-10000-04893. Work is 80% complete(Minimum 75% percent completed as determined by inspection).Including Mechanical, electrical and Plumbing.
install 16 gas boilers in the cellar existing boiler room. no change in use, occupancy or egress. existing co #B55519
Mech work related to renovation of existing commercial space Installation 8 ton split HVAC units with ductwork & 1 bathroom exhaust fans & ductwork
Finish Out for 1st Floor 32571 SF - remodel to connect to existing hospital 1984 SF Cooling Tower Enclosure and pedestrian walkway to South Garage
Finish Out of Guest Rooms and Supporting Areas for Floor 2
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Site Plan Condo *Green Building* - New Single family residence with 2 bedrooms 2.5 bathrooms and an attached 2-car garage
Replacement of complete existing central heat and air system with or without duct work
***Timed Virtual Inspection: 04/03/2026 @ 8 AM*** Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work 1 system: 3 ton 14 seer2 YORK heat pump and air handler
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Proposed new one story 4969 sf convenience store.
1 of 5 Unit 4-story Multi-Family Building with 4 Bedrooms and 5 bathrooms Game Room Covered Porch and Covered Deck on 2nd & 4th Floor Storage on 4th Floor with Attached 2 Car Garages (Suite 15) SP-201...
Provide services to support Mechanical equipment removals and new installations