13,622 permits · HVAC
Replacement of complete existing central heat and air system with or without duct work
New construction of SFR with 3 beds and 2.5 baths
Filing for the direct replacement of the existing HVAC, condenser, and air handler inkind. No change in use, egress,s or occupancy.
Self-cert 209 cbrc: interior demolition to existing kitchen and mezzanine at floor 20. scope includes demolition of plumbing lines and drains that penetrate the level 20 slab, electrical equipment, ki...
Self cert 2019 cbrc: interior alteration of an existing tenant on the ground floor of an existing retail center for midwest express. work to include demo, new partitions, electrical, plumbing, and hva...
X062_Provide new passenger elevator addition, accessible doors and hardware, wheelchair lift, and upgrade per ADA standards. Provide new exhaust ventilation system, ducted split unit, and electric hea...
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per plans.
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
PB: New construction of 1 story SFR
***Timed Virtual Inspection: 03/27/2026 @ 8 AM*** Replacement of complete existing central heat and air system with or without duct work
Decouple existing hot water system from steam boiler and replace it with new natural-gas-fired condensing water heaters
***Timed Virtual Inspection: 04/07/2026 @ 8 AM*** Replacement of complete existing central heat and air system with or without duct work
Application to remove and replace (1) 550 gal. underground fuel storage tank with (1) new 250 gal. aboveground fuel storage tank. (No change in use, egress, or occupancy)
install 16 gas boilers in the cellar existing boiler room. no change in use, occupancy or egress. existing co #B55519
Mechanical work in conjunction with renovation of 3-story nycha multiple dwelling throughout: provide new hvac system from the cellar to a new prefrabicated heating boiler pod; no changes to use, egre...
Mechanical work in 31st floor as per plans. No change to use, egress or occupancy.
Installation of new boilers at the boiler pod. no changes to use, egress, or occupancy.
Mechanical work associated with conversion of second floor from store to a residential dwelling unit.
Structural analysis to support new mechanical equipment installations
Proposed hvac improvements as per plans. no change to use, egress or occupancy
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com