14,177 permits matching "hvac"
Remove and dispose of existing fume hood. Prepare duct work for new fume hood connection. Replace existing duct grill as part of ceiling replacement.
Remove incinerator and cap existing flue. Install new flue lining in chimney. Remove existing thermostats throughout building and replace with new. Remove and replace ductwork, oil piping, vent piping...
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
New Construction of 3 story SFR Condo with 2 car garage covered patio 2nd floor balcony 3 beds 3.5 baths
Mechanical equipment use for partial demo (bobcat s250 skid-steer loader, hyundai r210lc-9 hydraulic excavator, brokk 110 hydraulic breaker, jlg 650 boom lift (or equivalent approved by engineer) for...
New ducts. new unit
Mechanical work during interior demo and white box construction on 9th floor
Mechanical work on the 17th floor (corridor/lobby/boardroom) as indicated on drawings.
Install 6 new under the window and 1 ducted package heat pump units for apt 7a. install kitchen hood and bathroom ventilation as per plan. no change in use egress or occupancy.
Proposed mechanical work including but not limited to relocation of existing air handling units and new duct work for new tenant banana republic. no change to use, egress, or occupancy.
Replacement of complete existing central heat and air system with or without duct work
Mechanical work taking place on the 21st floor as per plans filed herewith. no change in use, egress, or occupancy.
Install one (1) new gas-fired high pressure boiler as per plans. no change in use, egress or occupancy.
Subsequent filing for mechanical works; remove all existing radiators and install new water cooled heat pump units with ductworks and condenser water piping.
Provide Lintel for wall penetrations. Provide house keeping pads for mechanical equipment.
Boiler replacement and associated ducts and piping work as per plans filed herewith. no change in use, egress, or occupancy.
Existing (1) 4.5 ton split system and ceiling exhaust restroom fans to remain. New (1) 3 ton split system along with new ductwork proposed.
Ex. VRF multi-split heat recovery system to be used for air conditioning dining, service and prep area. Ex. ceiling exhaust fans for restroom to remain. Ex. ERV to be reused for outside air requiremen...
Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy.
Nyu langone - brooklyn augustana 3rd fl rehab - mechanical modifications as per plans filed herewith. no changes in use, egress or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com