168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Eplan: Demolition 1-story SFD and detached Garage"COMPLY WITH DEPARTMENT ORDER effective date 06/08/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"
The scope of work consists of non-structural demolition & new tenant fit-out of an existing retail space. new work includes interior non-load bearing partitions & finishes. no chan…
Installation of temporary construction fence for interior demolition of 1st floor as marked of two-story commercial building.
Eplansupplemental permit for:- demolition & removal of (e) carport & low wall due to severe termite and/or dry-rot damage; new cmu low wall & pillars to replace (e) carport.- struc…
Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on the 20th floor (SNA Displays) as per plans. No change to use, egress or occ…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Basement floor (BOA) as per plans. No change to use, egress or occupancy.
1906 san fernando st - bsb order
Herewith filed for the demolition of a one story brick and wood frame building.
Demolish portable classroom (Bldg D) per plan.
Interior Non-Structural Demolition on Floor 1 and 3
Interior Non-Structural Demolition
Demolition and repair for preparation of Tenant Alteration as per plans
Total Demo of SFR 1200 sqft circa 1967
Full demolition of a fully detached 1-story garage, at 207-04 garage 104 avenue, queens, ny 11429
Proposed demolition of ex office building. see comments.
Chevelle (res)
Total Demo of SFR 4386 sqft circa 1967
demolish the interior fixture, finishes of the kitchen, & bathroom. defer submittal for renovation permit will be submitted following the analysis of the exposed structure.
revision 202602105669: per inspector direction to correctly capture filed condition: stair access doors @ bsmt, 3rd fl e) conditions, as well as boh restrooms/ office for basement…
To construct a detached single-family townhome lot 8, 3-stories with 3 bedrooms and 3 bathrooms, 2130 sq ft conditioned space, 420 sq ft garage and 315 sq ft covered balcony/porch.…