168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Mechanical work as per plans. No change in use, egress or occupancy.
General construction to allow for new hot water & heating equipment in the mer at cellar per plans filed herewith. restoration of existing finishes. no change to use, egress, or oc…
Mechanical modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy.
Nycha boiler general construction in the cellar as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical work for new outdoor mechanical exhaust unit with associated ducts servicing existing laundry room as per plans filed herewith. no change in use, egress or occupancy. al…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Full hand demolition of a 2-1/2 story frame building using handheld devices. foundation to be removed using mechanical means
Nycha boiler general construction in the cellar as per plans filed herewith. no change to use, egress, or occupancy.
Modifications of ductwork connected to existing units on 11th floor. no new units proposed, no eup's required. filed as gc worktype per dob april 4, 2024 service notice. no change…
Renovation of an existing deli store and filed duct work for existing kitchen ventilation system. no change to exist. use, egress or occupancy
M533 : 800 Division Road : New Installation of 2 Electric Boilers and associated equipment and piping.
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #21) as per the plans filed herewith.
full demolition of one story structure using hand held, and mechanical means to assist.
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #22) as per the plans filed herewith.
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #23) as per the plans filed herewith.
Install Air cooled VRF heat pump condensing unit with 4 hi wall units for heating and cooling. Install ERV for ventilation. Remove existing exhaust fan and associated ductwork.
Filing to install Pizzeria Kitchen hood and ductwork as per plans. No change in use, egress or occupancy.
Mechanical filing for kitchen exhausthood in conjunction with alt-1 filing to enlarge the 1st. floor and add a new third floor.
Replace cooliing tower as per plans. no change in use, occupancy, or egress.
Installation of needle beam for demolition work as per plans. needle beam shall comply with chapter 33 of the 2022 nyc building code.
(2) 4-ton split system air conditioning systems, bathroom & kitchen exhaust