13,740 permits · HVAC
Sheldon S403 A Right New - 2 Story SFR w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
remodel entire interior of the property reconfigure laundry room replace interior and exterior doors replace windows reconfigure master bathroom install new flooring new drywall in areas as needed
Mechanical modifications taking place on the 16th floor as per plans filed herewith. No change in use, egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work
Herewith file mechanical plans in conjunction with general construction, PW3 fees generated in this S2 document are paid separately from the I1 document.
Mechanical work involving installation of packaged water cooled AC Unit
Installation/filing of mechanical systems and equipment (split heat pump systems for proposed community facility center on first floor of existing building.
Mechanical modifications taking place on the 6th floor as per plans filed herewith. No change in use, egress or occupancy.
mechanical work in conjunction with I1 filing
Upgrade dust collection system, replace ductwork and associated ventilation system.
Filing herewith mechanical work as per plans filed herewith. No change to use, egress or occupancy.
Cut and point bricks, and rebuild brickwork in various locations. Replace damaged window sills. Scrape prime and paint A/C louvers.
Installation of ductless mini split system for heating and cooling as per plans filed herewith . no change in use egress or occupancy
installation of new VRF split heat pump system for existing elevator mechanical room. No change to egress or occupancy
Replacement of existing gas dryers in existing laundry room. existing ductwork to be replaced in its entirety at laundry room. no exterior work is proposed.
Construct Interior alterations to Children's Hospital on Level 1 of Forest A wing (CT Scan) per plan. Mechanical included this permit.
Installation of mechanical systems as per plans filed. no change to use, egress or occupancy.
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
Mechanical filing as per plans. No change in use, egress or occupancy.
New two-story SFR (4br/3ba) with attached garage covered porch and covered patio *PRODUCTION BUILDER- GREEN BUILDING*