Search Building Permits
2,850 permits · HVAC · NY
Legalization & installation of heating, ventilation, air conditioning system with associated ducts and piping
Interior renovation of cellar,basement,1st,2nd and 3rd floor of exist. 3 story building.Demolition work and construction work as per plan.Install new HVAC,exhaust fan,partition,flooring,ceiling and pa...
Replacement of existing combination space heating & domestic water equipment w/ new dual burner steam boiler & gas fired hot water boiler + indirect heater.
Installation of new air conditioning units to provide cooling and heating to the building.
NYCHA BOILER_BLDG#4_Remove exist steam-fired DHWH exchanger. Remove and replace sump pump. Install new gas water heaters and storage tank, sump pumps, floor drains, and gas piping. Provide new water c...
Install new boilers in cellar as per plans
File to resovle ecb violations 39155569y, 35667110y, 35667109r and 35667108p. interior renovation, installing new windows and installing new air condition units as per plans. no change in use, egress...
Proposed installation of air conditioner system as per plan. no change in use, egress or occupancy under this application.
Nycha boiler - foundation and structural work for new mechanical boiler room 1 story building.
Replace gas-fired hot water boiler with hot water heater and connect to existing gas piping as per plans. no change in use, occupancy or egress
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #9) as per the plans filed herewith.
Remove existing HW Heater, Tank and Equipment Pad, Cut/Cap Existing Gas Piping, Remove existing water lines to Boilers Provide new Gas-Fired Hot water heater, Circulation Pump Gas piping, RPA, Blow Do...
Replace air conditioning unit.
Modifying HVAC system to serve new configuration as per plans. No change in use, egress or occupancy.
Filing of hvac systems to obtain certificate of compliances as per plans. no change to use, occupancy or egress.
File construction work to remove partitions and install new boiler room as per plan. no change in use, egress or occupancy.
Application filed in conjunction alt-co application to install new gas piping, gas boilers and plumbing fixtures all as per plans filed herewith.
Install new hot water boiler as per plans. no change in use, occupancy, or egress.
Replace oil fired boiler with gas/oil fired boiler. change grade of fuel oil from #4 to #2.
Installation of new hvac system associated with nb application filed under initial filing