Search Building Permits
4,823 permits · New Construction
New townhouse including foundation, walls, doors, and finsihes.
New townhouse including foundation, walls, doors, and finsihes.
New townhouse including foundation, walls, doors, and finsihes.
New townhouse including foundation, walls, doors, and finsihes.
New construction of a detached garage, with rear wall acting as retaining wall.
New townhouse including foundation, walls, doors, and finsihes.
New townhouse including foundation, walls, doors, and finsihes.
New townhouse including foundation, walls, doors, and finsihes.
New townhouse including foundation, walls, doors, and finsihes.
New construction, addition, GFA change - Erection of a two-story attached structure (NTE 38 ft) in height for a Single-Family dwelling as per plan.
Proposed installation of temporary pipe scaffold for new building as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applicati...
Temporary structure for an WNBA event at HY Plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Subsequent filing for mechanical scope of work associated with the new building.
Foundation / Earthwork application filed subsequent to NB GC, job number: Q08048244-I1.
New construction of SFR
New construction of SFR
Installation of a personnel hoist as per plans in conjunction with nb construction. no change in use, egress or occupancy under this application. hoist installed in accordance with 2022 nyc building c...
Self cert 2019 cbrc - new construction of a 3 story frame 3 dwelling unit residence with 3 story open rear porch.(occupancy classsification r5; iiib type construction)
Self cert 2019 cbrc - new construction of 3 story frame 3 dwelling units residence with a 3 story open rear porch(occupancy classification r5)( iiib type construction )
Galloway 3312 A Right New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 684.49 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld h...