Search Building Permits
5,430 permits · Roofing · NY
Remove existing Roof drains/piping, replace with new drain, piping and flashing. Re-flash, wire brush, repaint existing vent stack. Replace Fire pump including piping, fittings, valves and controller....
Installing 4 new roof drains and re-flashing of existing vent stack extensions.
Remove and Re-install existing roof mechanical equipment
Replace existing roof drains
Decommission of existing T-MOBILE site on the roof. Initial application filed under Job No. B00081867. No change in use, egress or occupancy.
Two generators installed in open space. each generator consist of belly tank, main breaker, battery charger, muffler, weatherproof attenuation enclosure.
Installation of roof overhead protection in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy.
Q002- replace rooftop gravity ventilators & exhaust fans.
Installation of new sidewalk shed for reso a rooftop playground - ps 290m at 311 east 82 street, manhattan as indicated on plans. there will be no change in the use, egress, or occupancy under this ap...
Installation of a temporarily supported scaffold, overhead and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Selective roof replacements, parapet replacements, and exterior masonry repairs, along with miscellaneous MEP work related to the aforementioned replacements.
Alt CO filed to combine 2nd floor dwelling units, remove and replace stair bulkhead at roof as per plans.
Nstall new fixtures in conjunction with new spa and outdoor kitchen for residential passive recreation roof terrace recreation. new outdoor gas grille, sink, gas cooktop, outdoor shower, spa and ventl...
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Filing herewith general construction and structural in Electrical and VFD Control Room improvements (to address new equipment located there and, on the roof above-Main Building). No Change in use, egr...
Installation of new packaged rooftop emergency generator w/ integral fuel storage tank in this pre-1968 existing building. no change in use or egress.
General renovations consisting of demolition and construction at Rooftop Bar, Lounge, Kitchen, Back of house spaces and Marquee at existing Hotel
Structural work for new steel dunnage installation atop existing roof for new mechanical equipment as per plans filed herewith. no change in use, egress or occupancy.
New (2) 5 ton 'trane' outdoor rooftop units as filed under application #520369761.
Obtain cert. of compliance for existing rooftop hvac unit(s) for apt 5ab, as per plans and specs filed herewith, in accordance with approved -lpc permit cne lpc-26-07406 dated 03-05-2026. see comments...