6,681 permits · New Construction
New Construction - FOR THE ERECTION OF AN ATTACHED THREE (3) STORY STRUCTURE OF TYPE V-B CONSTRUCTION FOR USE AS A THREE (3) FAMILY DWELLING (GROUP R-2). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R....
Installation of temporary construction fence for new buildings at 346 and 348 pacific avenue.
Temporary construction fence filed in conjunction with NB# Q00759622-i1 detached 2-family house and NB# Q00914930-i1 detached accessory garage.
Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during new building work. sidewalk shed and pipe scaffold to comply with chapter 33 of the nyc building code of...
Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during new building work. sidewalk shed and pipe scaffold to comply with chapter 33 of the nyc building code of...
Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during new building work. sidewalk shed and pipe scaffold to comply with chapter 33 of the nyc building code of...
Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during new building work. sidewalk shed and pipe scaffold to comply with chapter 33 of the nyc building code of...
Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during new building work. sidewalk shed and pipe scaffold to comply with chapter 33 of the nyc building code of...
Propose support of excavation involves excavation, new retaining walls in conjunction with NB application. No change of Occupancy, Use and Egress.
Installation of temporary construction fence for new buildings at 257 & 259 oakdale street.
Installation of temporary construction fence for new buildings at 354 and 356 pacific avenue.
Installation of temporary construction fence for new residential buildings at 352 & 350 pacific avenue
Filed herewith plans and application for a new temporary plywood construction fence filed in conjunction with new building on lot 15.
Installation of suspended scaffold outrigger system for exterior facade restoration work at 2350 5th avenue, new york, ny 10037. work shall comply with chapter 33 of the 2022 nyc building code. no chn...
Temporary plywood construction fence in conjunction with alt# q01022275 & nb gar# q01098901.
Propose structural work type for a 3-story residential building w/ penthouse & cellar, in conjunction w/ nb application number b01038276-i1.
Propose structural work type for a 3-story residential building w/ penthouse & cellar, in conjunction w/ nb application number b01038287-i1.
Fence application filed subsequent to Alt-CO NB application: X01280071-I1.
Errect new building, 3-story with cellar and 3-family. filing includes mechanical and structural works per approved plans
Mechanical Systems installed in conjunction with NB # B01252041-I1