14,271 permits matching "hvac"
Mechanical modifications taking place on the 4th floor as per drawings filed herewith. no change in use, egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work 3-TON CONDENSER CHANGE-OUT IN BACKYARD & 66 BTU FURNACE CHANGE-OUT IN ATTIC
Livingston S428 B Left New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Falcon S404 C Left New - 2 Story SFR w/ 4 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Remodel existing restaurant space for new tenant install new awnings over existing patio.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 1.5 Ton Vertical Gas System
BLDG 2 UNIT 2B: New 2-story duplex unit w/ 2 bedroom 2.5 bath covered patio covered/screened deck above second floor. Part of 3-unit use.
Dexter 3317 C Left New - 2 Story SFR CONDOMINUM w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 681.02 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld he...
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
Herewith filing for heating and air conditioning for a 1-family house. Refer to New Building application # Q00793333-I1 for all related architectural information.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 Ton Two Stage Vertical Gas System
Highland 3313 C Right New - 1 Story SFR CONDOMINUM w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 682.61 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld h...
Filing for mechanical work at the 1st floor. No change to use, egress, or occupancy.
Mechanical modifications taking place on the 6th floor as per drawings filed herewith. no change in use, egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work
Express: Replacing windows size for size new siding Upgrade finishes and fixtures in bathrooms and kitchen.
Mechanical work as shown on plans filed herewith, at construction floor 13/marketiing floor 16 & construction floor 14/marketing floor 17. no change in use egress or occupancy under this application
Mechanical specifications filed in conjunction with gc application b01333932-i1
Removal and installation of ductwork, diffusers, fans, ac units and related mechanical piping. no change in use, egress or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com