5,433 permits · Roofing · NY
Installation of (3) air cooled split systems & (2) air cooled roof top units located on the 14th floor roof.
Filing herewith for the modification of existing rooftop steel dunnage and installation of new. dunnage
Prop. to correct violation, new flooring at basmt, install 5/8 Plwood and floor tiles. Prop. to cap and remove gas stove andRes sink on the second floor . Prop HVAC at roof ontop of 2 new steel beams....
Application of new interior fireproofing only to existing elements & exterior masonry alterations as per plans filed herewith. no change in use, egress or occupancy.
dunnage modifications at roof, ramps for accessible terrace roofs
ShopRite:Proposed interior alterations,as shown on plans.The work includes the removal of existing shelving&refrigerated cases,and the installation of new shelving and cases.New roof top refrigeration...
Replacement of roofing assembly at all roofs, repairs/install of roof guardrails, masonry repairs, flood elimination at cellar
Proposed new hvac system at roof and new mechanical ventilations in bathrooms and kitchens, no change of use, egress or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Herewith submitting application type ii for installation of new mechanical exhaust system (hood, duct, and blower at roof). no change in use, egress or occupancy.
Replac exist (7) roof drains. relocate exist (4) vent stack & extend 4' above finished roof. Power flush, clean & test new vent stack. Power flush & clean entire storm drains system, all leaders & sto...
Direct replacement of Heat pump on roof servicing the elevator machine room only
Proposed renovation of existing apartment building. Remove all existing roofing and sheathing at main roof, and bulkhead roof. No change of use, egress or occupancy under this application. See comment...
replacement of air cooled chillers, condensers at Roof & associated piping
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Remove existing roof drains and provide new roof drains.
Air conditioning units replacement on the roof. All existing ductwork to remain. No change in use egress and occupancy.
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
Installation of photovoltaic solar array on roof including all related structural work as per plans filed herewith. no changeto use, egress or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com