168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Structural work - framing for new mechanical shaft enclosure, a new dunnage platform, and mechanical openings in existing load-bearing masonry walls. no change in use, egress, or o…
Mechanical modifications as indicated on plans. no change in use, egress or occupancy.
Modifications to the existing Mechanical systems and ductwork on the 3rd floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Relocated ductwork as per plans. no change of use, egress or occupancy.
NYCHA Sumner BOILER-BLDG #12- Architectural work being filed for interior repair to existing Mechanical room correspondent to the Sumner BL Houses Project
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Demolish ex building down to foundation. rebuild & vertically enlage building for 4-story, 3-family building on existing foundation. reinfoce existing cellar. related structural, m…
Modification to mechanical system as per plans.
Mechanical work in conjunction with renovation of 5-story nycha multiple dwelling throughout:installation of new air-conditioning systems, ventilation systems and miscellanceous hv…
Mechanical application as per plans
Proposed enlargement of existing 2 story 2 family dwelling with accessory off-street parking for 2 cars. temporary construction fence, plumbing & curb cut to filed filed separately…
Installation of overhead protection in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occcupancy.
Mechanical work in conjunction with renovation of 5-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous h…
Interior renovation to tenants' recreation facility on the 45th floor. work to include general construction, as per plans. plumbing and mechanical work to be filed separately. no c…
Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 34 and 35th Floors as per plans (Willkie Farr & Gallagher - Phase 1.) No…
Mechanical work in conjunction with interior renovation.
Replace existing hvac units as per plans. no change of use, egress or occupancy.
Installation of fuel tank connected to mobile trailer unit to provide temporary heat to the building.
Installation of temporary betamax hoist as per plans. no change in use, egress or occupancy.
Mechanical work on the 38th floor (Nuvation Bio) as indicated on drawings,
Equipment use: single 7000 # capacity personnel hoist during bldg const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this a…