Indoor a/c units and roof condensers; kitchen, dryer, bathrooms and fireplace exhausts.
Replacement of 6 ton condensing unit on the roof. no change to egress, use, or occupancy.
Interior work on the ground floor and exterior work to add hot dub , deck and fence to roof. no change to use, occupancy or egress.
NSCP North side Chiller Plant. Application filed for replacement of existing chillers, rooftop cooling towers, and interior renovations to spaces with accessory uses: office, works…
Interior renovation of existing apartment #15 at fourth floor replace existing roof wood joist 3x8 @ 16 o.c. damaged by water as per plan.this filing is intended to address oath/ec…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Exterior masonry, roof, flood elimination, replace ramp at entrance
Roofing Replacement and Roof Structure Renovation
Renovation on roof of exist. commercial building with, replace roofing as per plan. no change in use, egress or occupancy.
Replacement of sidewalk slab, steel beams, sidewalk wearing course, roadway, and granite curb including installation of waterproofing membrane.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Roofing Replacement and Roof Structure Renovation
Modification to existing VERIZON site on the roof. Replace 6 RRH units and 3 antennas, install 3 antennas, remove 1 equipment cabinet, and install a new platform with 3 cabinets on…
Replacement of existing chiller and chiller pumps on technical (mechanical) roof, work to include the split systems to serve Server room on 6th floor as per plans filed herewith. N…
Structural modification to provide new catwalk support to service existing heat exchanger at main Roof. No change in use, egress or occupancy.
removal of pv solar modules from mounting system on roof. No change of use, egress, or occupancy.
New air conditioning system for rooms on the second floor with A/C condenser unit on the roof.
Replacement of air cooled chiller on the roof. No change in use egress and occupancy.
Hoist installation for roof repairs, no change in use, egress, or occupancy.
Installation of a temporary roof, overhead, and window protection, per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupa…
Upgrade mechanical ventilation system in cellr garage, and roof above , modification and additional duct work. all as per plan . no change in use egress or occupancy