168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Demolition of existing retail building by hand wreck method
ePlan. Demolition of existing 1story SFD and detached garage
to demolish 1 story detached garage.
unit# 403 revision pa# 202603177719: demolition of (2) non load bearing walls in kitchen area & change location of washer & ventless dryer. extend clodet wall to fit the new washer…
level 21 and 22: interior non-structural "soft" demolition. removal of existing interior improvements including non-structural partitions, millwork, fixtures and finishes. project…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Standard-Demolition:4811/54th - COLLEGE AREA: Demolition Permit for the Proposed Demolition of an 8FT in Depth Pool for an existing SDU: Historic Determination PRJ-1080130 on 03/30…
Supplemental to 25014-10000-03946 to capture revision to demolish and rebuild part of existing exterior wall
Standard-Demolition:5637/Baja - COLLEGE AREA: Demolition Permit for the removal of a 5ft Depth Pool for an existing SDU: RS-1-7.
Rapid Review-Standard-Building Construction:5104/Arvinels - **Scope Change (12/15/2025)** CLAIREMONT MESA :Combination building permit; For the proposed remodel and addition to an…
ePlan Demolition of (e) detached garage
Rapid Review-Standard-Building Construction:1709/Bancroft - **SCOPE UPDATE (03/26/2026)** GREATER GOLDEN HILL; Combination Building Permit for a proposed interior/exterior remodel…
EPLAN Supplemental to Permit No. 25014-10000-02264 to revise demolition and floor plans, add new wall callouts, and update sections to reflect revised ceiling heights.
Demo existing detached garage
revision to bpa# 202602055323: deck demolition and reconstruction. originally planned as <50% repair, but wood in too poor condition that 100% replacement needed.
interior demolition of select floor and wall finishes in the ground floor dining room, no work/demo to exterior of the building. mezzanine dining area, ground floor bar/kitchen res…
Eplan: demo (e) detached garage
Standard-Demolition:2274/Via Aprilia - TORREY PINES; Demolition/Removal Permit for an existing SDU, 1,280 SF, 3 bedrooms. RS-1-7. Prior discretionary on-site. Prior historical dete…
General-Standard-Building Construction:4682/Clairemont - CLAIREMONT MESA; Combination Building Permit; For the proposed demolition of the attached 1-car garage and the proposed, ne…
Eplan: Demo the (E) 1964sf duplex
General-Standard-Building Construction:4682/Clairemont - CLAIREMONT MESA; Combination Building Permit; For the proposed demolition of the attached 1-car garage and the proposed, ne…