Search Building Permits
2,081 permits · Demolition · NY
Minor interior demolition. Installation of interior partitions, doors, suspended ceilings, flooring and finishes on the 30th Floor as per plans (Hines - Demo & Whitebox.) No change to use, egress or o...
Demolition of interior finishes, stair and interior partitions, windows/sliding door on 3rd floor. new partitions and finishes on 2nd and 3rd floor . no change to use, egress, or occupancy.
interior demolition of non-bearing partitions in the existing doctors' office.
Interior demolition of non load bearing partitions on the 15th floor (NE corner) as indicated on drawings.
installation of construction fence to protect site during full demolition.
Full demolition of the existing 1-story building
Interior demolition and installation of new partitions and finishes on partial 6th floor in the existing office building as per plans filed herewith only. No change to zoning, use, egress, or occupanc...
installation of construction fence to protect site, during full demolition
installation of construction fence, to protect site during full demolition
Hand demolition of existing garage
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or...
Demolition of non-load bearing paritions, intallation of new partitions, doors, suspended ceilings and finishes on the eighth (8th) floor, apt. 8a as per plans. no change to use, egress or occupancy.
Filing application for minor non-structural demolition and construction in cellar portion of duplex commercial unit. All work as per plans filed herewith. No change in use, egress or occupancy.
3 story wood frame building to be fully demolished with hand tools only. Mechanical equipment to be used for debris removal, truck loading, and crushed slab on grade.
Hand Demo of 1 1/2 Story Detached House, 23' High
Supported scaffold installation for interior demolition and ground plaza demo means and methods. no change in use, egress or occupancy.
Demolish existing split unit, and provide new vrf ststem to existing office space.
Interior demolition of non load bearing partitions on the 17th floor as indicated on drawings.
Application is filed for interior demolition andrenovation in cellar that doesn't affect use, egress oroccupancy of the space, and therefore, no new or amendedcertificate of occupancy is required
Minor demolition with intallation of new partitions, doors, suspended ceilings and finishes on the third (3rd) floor, apt. 3f as per plans. no change to use, egress or occupancy.