Search Building Permits
2,850 permits · HVAC · NY
Proposed installation of air conditioner system as per plan. no change in use, egress or occupancy under this application.
Jacobi Medical Center proposed Mechanical-HVAC work interior renovation of an MRI on 3rd and 4th Floor. No change in use, egress or occupancy. All as per plans filed herewith.
Heating, ventilation, and air conditioning work as per the architectural layout.
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #9) as per the plans filed herewith.
File construction work to remove partitions and install new boiler room as per plan. no change in use, egress or occupancy.
Install new HVAC system. No change in use, egress or occupancy.
Install new hot water boiler as per plans. no change in use, occupancy, or egress.
Installation of new hvac mechanical systems within existing single-family home. no change in use, egress, or occupancy.
Filing of hvac systems to obtain certificate of compliances as per plans. no change to use, occupancy or egress.
Nycha boiler - foundation and structural work for new mechanical boiler room 1 story building.
Nycha boiler general construction in the cellar as per plans filed herewith. no change to use, egress, or occupancy.
File to resovle ecb violations 39155569y, 35667110y, 35667109r and 35667108p. interior renovation, installing new windows and installing new air condition units as per plans. no change in use, egress...
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modifications & replacement to existing hvac system throughout building. no change in use, egress, or occupancy.
Replace oil fired boiler with gas/oil fired boiler. change grade of fuel oil from #4 to #2.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #9) as per the plans filed herewith.
Installation of new hvac mechanical systems within existing single-family home. no change in use, egress, or occupancy.
Remove existing HW Heater, Tank and Equipment Pad, Cut/Cap Existing Gas Piping, Remove existing water lines to Boilers Provide new Gas-Fired Hot water heater, Circulation Pump Gas piping, RPA, Blow Do...
Heating, ventilation, and air conditioning work as per the architectural layout.