168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Change of Use - Vacant
Change of Use - Vacant
Change of Use - Vacant
Change of Use - Vacant
Change of Use - Vacant
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Change of Use - Financial Services
Change of Use - Vacant
EZ Interior Non-Load-Bearing Wall Demo. - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references…
Excavation - Site / Utility Permit for CP-2025-004436
EZ Exterior Window and Door Replacement - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references…
Temporary tents and canopies - assembly use tent - lawful occupancy shall be as posted - removal date electrical permit required, unless power is provided through existing exterior…
Tank install/removal - to remove two (2) 10,000 gallon underground storage tanks (ust that were previously used to store heating oil for the building. all work to be done in accord…
Certificate of occupancy (co) (may include lo) - no alterations this permit. for the issuance of a certificate of occupancy for a partial change in occupancy to group m retail sale…
EZ Interior Non-Load-Bearing Wall Demo. - EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attache…
EZ Interior Non-Load-Bearing Wall Demo. - EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attache…
Rough-in - rough-in permit for fp-2026-000694 supply and install all required sprinklers per nfpa 13 supply and install all required piping, hangers and fittings per nfpa 13
Make safe permit for rp - make safe permit to comply with case #cf-2024-128981- for the repair of an existing structure damaged by fire as per engineer's report and plan. abutting…
Commercial make safe permit - make safe permit to comply with cf-2025-122457 to include partial demolition and repairs/replacement of 2nd floor front dormer framing per approved pl…
Change of Use - Residential - Household Living - Two-Family
Change of Use - Retail Sales - Food, Beverages, and Groceries; Retail Sales - Consumer Goods