168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of 300 psf sidewalk shed, pipe scaffold and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occ…
Q169-replacement of roof & parapet walls. replacement of select exterior doors & ceiling. installation of new exterior louvers, windows & window guards.
Q041- Roof, Parapet, & Exterior Masonry Replacement Mechanical Work
Providing roofing replacement, parapet replacement including 14th floor exterior facade work from 14th floor lintel to roof level and rooftop structure repairs and entrance canopy…
Q181_Reconstruct main entrance vestibule slab structure. Perform exterior masonry work. Remove and replace foundation wall waterproofing, main/low/bulkhead roofing systems, exhaust…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Install roof protection
Install new wet sprinkler system complaying to nfpa-13r, 2007 requirements on 1st, 2nd, 3rd and 4th floor, roof & cellar level
Miscellaneous replacement or brick masonry, repair of limestone lintels, brick spandrel replacement, limestone repairs, clay roof tile replacement, repair or dormer per plans. No c…
Remove & rebuild parapet walls, replace existing roof system in kind, masonry repairs & repointing as indicated on plans, installation of roof access ladders on different roofs , a…
Remove & rebuild parapet walls, replace existing roof system in kind, masonry repairs & repointing as indicated on plans, installation of roof access ladders on different roofs , a…
Exterior masonry, parapets, windows, and roofs
Remove existing roof top unit & install new split system. no change in means of egress suse group, or occupancy.
Structural modifications for new steel framing at 5th fl, roof level, and wall opening for exhaust ductwork including limited concrete infil of minor existing mep penatrations at r…
This MS filing is to supersede the old BIS job# 402250407 and remove the abandoned HVAC rooftop unit including its ductwork and the related support. Remove ECB violation 34630799H.…
sprinkler standpipe modifications associated with alt-co M01328972 for conversion of existing commercial 12-storey commercial building to mixed-use commercial and residential use o…
Removal of ducts and CHWS&R/HWS&R piping on the 5th floor, removal of AHU and associated ducts and piping on the Roof to accommodate new mechanical equipment on Roof and related du…
Partial Demolition/ Renovation of 8th floor and additional enabling work on Cellar, 1st, 3rd, 4th, 5th, 7th and roof as shown on plans filed herewith. Filed in conjunction with sub…
Installation of roof overhead protection. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Application to repair/replace existing asphalt roof,skylight, hatch door as per plan. no change in use,egress and occupancy