5,467 permits · Roofing · NY
Reinforce existing interior floor framing and roof terrace framing, design of rear lateral shear walls, and design of new roof dormer. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Mechanical work for Olives restaurant including commercial kitchen rangehood ventilation system and replacement of rooftop termination below the parapet. No change of use, occupancy or egress.
Mechanical modifications on floors 1-8 and 8th Fl Roof, as per plans filed herewith. No changes in use, egress or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of PV solar on existing roof no change to egress or use of occupancy
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Remove and Re-install existing roof mechanical equipment
Replace existing roof drains
Nstall new fixtures in conjunction with new spa and outdoor kitchen for residential passive recreation roof terrace recreation. new outdoor gas grille, sink, gas cooktop, outdoor shower, spa and ventl...
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Filing herewith general construction and structural in Electrical and VFD Control Room improvements (to address new equipment located there and, on the roof above-Main Building). No Change in use, egr...
Installation of new packaged rooftop emergency generator w/ integral fuel storage tank in this pre-1968 existing building. no change in use or egress.
General renovations consisting of demolition and construction at Rooftop Bar, Lounge, Kitchen, Back of house spaces and Marquee at existing Hotel