Mechanical upgrades and chiller replacement on roof as shown on plans filed herewith. no change in use, egress, or occupancy.
Install Steel Dunnage for 2 HVAC Equipment's at the roof top level.
Replacement of roof mounted air conditioning unit. All existing ductwork to remain. No change in use egress and occupancy.
Mechanical modifications taking place on the cellar, first and roof. no change in use, egress or occupancy.
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Interior renovation of #7a duplex apartment. new finish in the primary bath and powder room, and kitchen. replace combustible deck at roof terrace w/ new pavers. no change in use,…
Modification to existing T-Mobile site. Remove 1 antenna frame, relocate 5 antennas, install 1 additional antenna, and relocate 1 RRU on the roof.
Maintenance repairs including concrete repairs, structural steel repairs, new waterproofing applications.
Modification to existing VERIZON site on the roof. Replacement of 6 antennas and 6 RRH units. Installation of 1 sector (3 antennas) with associated parts and 1 platform with 3 rela…
Partial demolition of interior building structure including removal of interior slabs, joists, flooring, and facade walls as per plans. Roof demolition to be performed under separa…
Mechanical work on floors cellar, 001 thru 005 & roof as indicated on plans filed herewith. no change in use, egress or occupancy under this application
Renovation work to incude new ceilings,lighting, and partitions as shown on plans, patch and repair roofing as required for new penetrations. no change in use, egress or occupancy.
replace Air chiller unit and dehumidification system on roof and update ductwork as required
Garage repair and waterproofing
Exterior upgrades and roof replacement of 6-story nycha multiple dwelling as part of the nycha pact renovation in conjunction with required local law inspection (fisp). no changes…
Installation of a temporary overhead and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with t…
Interior gut rehab of existing building 1-story and cellar , vertical enlargement to add new 2nd floor and attic space and new roof , new brick faade all around.
NSCP North side Chiller Plant. Structural work for replacement of existing chillers and rooftop cooling towers as per plans.
Change of occupancy for eating or drinking establishment as per plan, with interior gc work for new layouts, and reconfigure roof, to obtain new c of o. removal of interior non-loa…
Application filed for roof and facade repairs as per plans. no change in use, egress or occupancy