5,429 permits · Roofing · NY
Application filed herewith to install new bathroom & kitchen roof mounted exhaust ventilators w/ new CAR fire rated damper. Vacuum clean all existing duct work. Provide new cabinet convectors at first...
Repair and waterproofing of lot line foundation wall. Removal of existing bathroom.
Replace and relocate 8-5 roof drains.
Installation of a code compliant railing at the rooftop as per the Department of Buildings' Cycle 9 FISP initial report & selective terracotta at the south facade. No change in use, egress or occupanc...
Structural modifications (vertical lift shaft enclosure) on the 1st & 2nd & roof floor as per plans. no change in use, egress or occupancy.
Removal of existing steel rafters and pyramidal shade canopies over ex. steel structure on the roof of 17th floor of a residential condominium to accommodate new solar panels. no change in egress, use...
Party wall-tie back and water proofing / parging at exposure 4, in-conjunction with full demo of adjacent lot
Proposed mechanical work including installation of air condition system and toilet exhaust air duct in conjunction with alt-co #b00696384 on cellar, third floor, fourth floor and roof. no change in us...
Repair and waterproofing of lot line foundation wall. Removal of existing bathroom.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
installation of solar panels, rooftop, railed, grid-tied, 9 modules, 3.69 KW
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Installation of a temporary roof protection as per plans during general construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building code, chapter 33.
Terrace roof replacement, parapet repair and railing installation as per plans filed herewith. No change to use, egress, or occupancy.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of photovoltaic solar array on existing roof system as per plans.
Installation of 300 psf sidewalk shed, overhead protection, roof protection and window protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress o...
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
Increase single story building height (not a vertical enlargement), roof replacement, minor partition work, facade renovation, new stair to roof.
Filing herewith Structural work, which includes new concrete house trap pit for underground utilities and reinforcement of roof framing as per plans.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com