5,467 permits · Roofing · NY
Roof repair & reroofing above sheathing. no change in use, occupancy, egress, or zoning.
Installation of solar panels, rooftop, grid tied, railed, 18 modules, 7.38 KW
Installation of solar panels, rooftop, grid tied, railed, 18 modules, 7.38 KW
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans
NYCHA MNP Site Building 2: Propose to renovate the existing 11-story multi-family for replacement of windows, Kitchens & Bathrooms, Interior finishes & new roof per plans. No change in use, egress & o...
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
Structural filing of RENOVATION OF A TWO STORY, two-family RESIDENCE to a two story two-family residence W/ A ROOFTOP ADDITION. Filings in conjunction: B00690699, B00690383, B00279293, B00279290, B002...
Strucural filed in conjunction to new building application. four story building wth cellar, roof & bulkhead, structural steel with concrete on metal deck. lateral system-structural stell moment and br...
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Mechanical work to renovate apt units #s2 at 3rd fl, #a3at 4th floor & roof. no change to use, egress oroccupancy
Installation of solar panels on roof. no change in use, egress, or occupancy.
installation of solar panels, rooftop, railed, grid-tied, 32 modules, 13.12 KW
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
Propose to install replacement roof top mechanical equipment as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
Mechanical work filed in conjunction with interior renovation to 8th floor offices. install new vrf condenser on roof, and 4 evaporators on the 8th floor, associated ductwork and diffusers.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com