168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Demo the (e) sfd and detached garage. abate order #a-6312252 effective 8/9/2024.
Total demo of a SFR 2429 sqft built 1980 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification
Interior alterations for office tenant fit-out. work includes selective demolition, new walls, ceilings, doors & hardware, casework and finishes
Demolition of non-loading partitions, ceiling and door removals as indicated on plans (1st and sub-cellar floors). no change in use, egress or occupancy.
Demo the (e) utility room.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
3510 ROOSEVELT AVE - Emergency Demo
Interior demolition and renovation of an existing residential unit, including the replacement of windows, exterior brick, and EIFS. Work limited to existing building footprint with…
Proposed temporary construction fence for the demolition of the existing building (14 coddington avenue) and for the construction of two new detached two family residences (12 & 16…
Demolition drawings
Demolition of detached house. on-site and off-site fill not to exceed 300 cubic yards.
proposed temporary fence for demolition Q01209807-I1 and to build new structure after. No change to use egress or occupancy under this application.
Demolition and general construction on 4th floor as per plans. No change to use, egress or occupancy.
Demolition of SFD & detached garage.
Demolition
Demolish detached garage. remove parking per ab 2097.
Interior demolition of non-load bearing walls, removal of all interior finishes and fixtures including, but not limited to the following, doors, frames, trim, shelving, as per plan…
Total demo of SFR 1680 sq ft circa 1963 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification r
Full demolition of existing builidg
Full demolition to a three story house
The vent hood is no longer on site. it was stolen and removed from the building in may 2025. since there is currently no physical vent hood present to remove or demolish, please co…