Search Building Permits
2,081 permits · Demolition · NY
3 story wood frame building to be fully demolished with hand tools only. Mechanical equipment to be used for debris removal, truck loading, and crushed slab on grade.
Hand Demo of 1 1/2 Story Detached House, 23' High
Supported scaffold installation for interior demolition and ground plaza demo means and methods. no change in use, egress or occupancy.
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or...
Hand Demo of 1 1/2 Story Detached House, 23' High
Demolish existing split unit, and provide new vrf ststem to existing office space.
Structure fully demolished under HPD & DOB IED.
Supported scaffold installation for interior demolition and ground plaza demo means and methods. no change in use, egress or occupancy.
3 story wood frame building to be fully demolished with hand tools only. Mechanical equipment to be used for debris removal, truck loading, and crushed slab on grade.
Application is filed for interior demolition andrenovation in cellar that doesn't affect use, egress oroccupancy of the space, and therefore, no new or amendedcertificate of occupancy is required
Interior demolition of non load bearing partitions on the 17th floor as indicated on drawings.
Minor demolition with intallation of new partitions, doors, suspended ceilings and finishes on the third (3rd) floor, apt. 3f as per plans. no change to use, egress or occupancy.
Demolition of non-load bearing paritions, intallation of new partitions, doors, suspended ceilings and finishes on the eighth (8th) floor, apt. 8a as per plans. no change to use, egress or occupancy.
Demolition and shoring drawings for CMU bearing walls at first floor existing of 4 story residential structure. Steel frame stabilization system. Repair of existing internal bearing walls all floors....
construction fence will be used to protect site, during full demolition.
Interior renovation to include demolition and construction of partitions in an existing office space. No change is use, egress, or occupancy.
installation of construction fence to protect site during full demolition
Partial demolition and reframing for new slab openings and partitions. Associated structural reinforcement. No change to use, egress, or occupancy.
Application is filed for the demolition of wood deck located in the backyard of the property. no change in use, egress or occupancy. all work as per plans submitted herewith.
Exterior renovation to include demolition of existing and construction of new partitions in Storefront - Retail D Space for existing office space. no change in use, egress, or occupancy.