Search Building Permits
2,850 permits · HVAC · NY
Modifications and additions to the existing HVAC system on the 14th and 17th Floors (ICBC), including modifications of ductwork and piping, and the addition of water source heat pumps as per plans. No...
Installation of new hvac system associated with nb application filed under initial filing
Replace air conditioning unit.
NYCHA BOILER-CARVER_BLDG #5_Provide a temporary boiler plant to serve the existing facilities during demolition of the existing boiler plant and construction of the new facility boiler plant.
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #9) as per the plans filed herewith.
Modifying HVAC system to serve new configuration as per plans. No change in use, egress or occupancy.
Filing of hvac systems to obtain certificate of compliances as per plans. no change to use, occupancy or egress.
Proposed installation of air conditioner system as per plan. no change in use, egress or occupancy under this application.
Replace gas-fired hot water boiler with hot water heater and connect to existing gas piping as per plans. no change in use, occupancy or egress
Remove existing HW Heater, Tank and Equipment Pad, Cut/Cap Existing Gas Piping, Remove existing water lines to Boilers Provide new Gas-Fired Hot water heater, Circulation Pump Gas piping, RPA, Blow Do...
HVAC in conjunction with two family alteration
Heating, ventilation, and air conditioning work as per the architectural layout.
Modifications & replacement to existing hvac system throughout building. no change in use, egress, or occupancy.
Support for new generator and ladder access, hvac equipment, and new boiler room. no change in use, egress, or occupancy.
Jacobi Medical Center proposed Mechanical-HVAC work interior renovation of an MRI on 3rd and 4th Floor. No change in use, egress or occupancy. All as per plans filed herewith.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Install new hot water boiler as per plans. no change in use, occupancy, or egress.
Installation of new hvac system associated with nb application filed under initial filing
Nycha boiler general construction in the cellar as per plans filed herewith. no change to use, egress, or occupancy.
Install two new boilers in the cellar.