Search Building Permits
4,810 permits · New Construction
New construction, addition, GFA change - FOR THE ERECTION OF A NEW ATTACHED STRUCTURE WITH CELLAR. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLAN.
New construction, addition, GFA change - FOR THE REMOVAL OF AN EXISTING FREE-STANDING OUTDOOR NON-ACCESSORY SIGN (DOUBLE-SIDED, 20’ H X 60’ W) AND STRUCTURE; SIZE AND LOCATION AS SHOWN IN THE PLAN
site permit-4 of 4, fire department training facility, bldg #c1, c2, c3, c4, c5, c6, and c7, 7-story, type 2b.
6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct
construction of a 1-story, type-v gold maintenance building and administrative offices including associated site work.
erect 12'x24' storage shed on sf golf course.
New Construction - FOR THE ERECTION OF AN ATTACHED SINGLE FAMILY HOUSE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
New Construction - FOR THE ERECTION OF AN ATTACHED STRUCTURE. STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SPRINKLERED THROUGHOUT PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR PLUMBING, MECHANIC...
New Construction - FOR THE ERECTION OF A THREE (3) STORY STRUCTURE OF TYPE V-A CONSTRUCTION FOR USE AS ONE (1) VACANT COMMERCIAL SPACE (SEPARATE PERMITS REQUIRED PRIOR TO FIT-OUT AND ISSUANCE OF C.O.)...
New Construction - FOR THE ERECTION OF AN ATTACHED TWO STORY BUILDING OF TYPE VB CONSTRUCTION FOR THE USE OF SINGLE FAMILY DWELLING (R3 OCCUPANCY). ENTIRE BUILDING TO BE FIRE SPRINKLERED PER NFPA 13D....
New Construction - FOR THE ERECTION OF AN ATTACHED TWO-STORY STRUCTURE WITH ATTIC FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DO...
Mechanical system for 19 dwelling new building
11 story, 21 dwellings new building
Structural work proposed for installation of vehicular ramp associated with NB construction. Structural work for the new building filed under B01085790-Z9.
Installation of a temporary construction fence as per plans in conjunction with nb construction. no change in use, egress or occupancy. fence to comply with 2022 nyc building code, chapter33
Nstall new mechanical ductwork along with a/c unit. as shown on drawings filed herewith. in conjunction with nb# m00530595.
Filing herewith mechanical work for new building as per plans.
New construction
Install Temporary Standpipe in conjunction with NB BIS # 321384649.
Proposed new building , 3-story, 3-family with cellar