168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New construction, addition, GFA change - Rear demotion and addition of an existing single family attached structure, size and location as shown on the plan.
New construction - for underpinning and for the construction of an attached structure with cellar and roof deck accessed by roof deck access structure. for use as two-family househ…
New construction - for the installation of a 2-inch fire service line for an automatic fire suppression sprinkler system with a backflow prevention assembly in accordance with nfpa…
Excavation - excavation work associated with a high rise new construction building (see permit cp-2025-005310) to include sheeting and shoring with associated raker installation as…
New Construction - For the erection of an attached structure with roof deck and roof deck access structure for use as single-family household living. Details including Size and loc…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
New construction - for new construction of a three-story attached building with basement. building to be fully sprinklered with nfpa 13d. separate permits required for excavation,…
New construction - for the installation of an automatic fire suppression system in accordance with nfpa 13d throughout three story building to include 1-inch combined water service…
New construction - for new construction of a six-story semi-detached structure with a roof deck and roof deck access structures. for use as a multi-family household living for sixt…
New construction - for a new construction of a four (4) story wood-frame semi-detached structure on reinforced concrete footings/foundations with a walkout deck on the second and t…
New construction - for the construction of an attached structure with cellar and roof deck accessed by roof deck access structure. for use as two-family household living. as per ap…
New construction, addition, gfa change - for the erection of an attached structure. size and location as shown on plans.
New construction, addition, gfa change - for the erection of an addition at the rear of an existing attached structure. size & location as shown on the application/plans.
New construction - for installation of a two-inch fire service line, two-inch backflow preventer and fire sprinkler system in accordance with approved plans, hydraulic calculations…
New construction - for installation of a two-inch fire service line, two-inch backflow preventer and fire sprinkler system in accordance with approved plans, hydraulic calculations…
New construction - for installation of a two-inch fire service line, two-inch backflow preventer and fire sprinkler system in accordance with approved plans, hydraulic calculations…
New construction - for the erection of a three (3) story attached structure of type v-b construction with basement, roof deck, and roof deck access structure (enclosed access stair…
New construction - for installation of a two-inch fire service line, two-inch backflow preventer and fire sprinkler system in accordance with approved plans, hydraulic calculations…
New construction, addition, GFA change - New 1 story addition to rear as per approved plan.
New construction, addition, gfa change - for the erection of a walkout rear roof deck on the second floor level of an existing attached structure. size and location as shown in app…
New construction, addition, gfa change - for the erection of a deck in the rear yard of an existing attached building. size and location as shown on the application/plan.