168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Application filed for ll 11/87 facade repairs as per plans here within. no change in use, occupancy, or egress.
NYCHA/Gowanus/Bldg4W- Int. reno. incl. repl. of kitchen & bath fixt., finishes, & cab.; upgrades to doors, partitions, & flooring. Accessibility work per BC-Ch.11 & Section504 for…
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch…
File to address ECB violation #39160816Z. Repair stucco cracks on the facade, replace second-floor window lintels, replace brick as needed, and recaulk windows as per plan. No chan…
Repair/replace the existing crack cement coating=500 sf
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Garage repairs as indicated per drawings. there is no change to use, egress, or occupancy
Proposed partial 3rd floor addition and interior renovations to a existing 1 family dwelling.
Temporary installation of adjustable suspended scaffold for faade inspection & repair. no change in use, egress, or occupancy. designated primary site supervisor: oscar castro
Removal and replacement of existing fire standpipe system throughout the Pier 40 building. Provide a class I automatic standpipe system throughout the building interior in accordan…
Crack repair , repointing and parapet wall replacement as per plan. no change in use, egress or occupancy with this application.
Minor foundation work being filed in conjunction with townhouse renovation #b00590748.
Application is filed for installation of 8'-0 high temporary construction fence, filed in conjunction with alteration filing S01325763-I1.
Interior renovation of existing apartment 5E. Remove of non-bearing closet partitions. Replace finishes, doors and kitchen cabinets.
Installation and use of temporary suspended scaffold for facade inspection and repairs as per plans filed herewith. no change to use, egress, or occupancy under this application.
Facade repairs as per plans filed herewith. no change in use, egress or occupancy.
Facade repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Facade repairs as per plans submitted herewith. there is no change in use egress or occupancy.
Interior renovation at Apt 7S with partition, floor, door, and finish changes as per plans. No change in use, egress, or occupancy under this application.
Installation of outrigger for the facade repair work as per plan submitted.
Propose renovation of existing residential building with partition work and finish work as per plan. No change in use, egress, or occupancy.